The plant runs through the day, so most of the solar generation is used on site. The system was engineered around the existing roof structure and the unit’s sanctioned load.
Result: estimated payback of about 3.5 years.
A 300 kW rooftop plant offsetting daytime process load at a manufacturing unit.
300 kW
capacity
Rooftop
installation
2026
commissioned
Tamil Nadu
location
~5 L
units / year
~380 t
CO₂ offset / year
Manufacturing
sector

The plant runs through the day, so most of the solar generation is used on site. The system was engineered around the existing roof structure and the unit’s sanctioned load.
Result: estimated payback of about 3.5 years.