Saratha Electroplaters — 100 kW Rooftop

A 100 kW rooftop system that cut an electroplating unit’s monthly energy cost by 78%.

100 kW
capacity

Rooftop
installation

2025
commissioned

Chennai, Tamil Nadu
location

~1.4 L
units / year

~110 t
CO₂ offset / year

Electroplating
sector

Solar panels on a flat commercial rooftop with city buildings behind

Electroplating runs heavy daytime loads, which makes it a strong fit for rooftop solar. We surveyed the roof, sized the system against twelve months of bills and handled design, procurement, installation and net-metering approval.

Result: 78% lower monthly energy cost, with an estimated payback of about 3 years.